Mine Slime Pond – Four-Layer Geosynthetic System

Cigar Lake, Saskatchewan

Who:  A local mine

What: This project consisted of a 40,500 m² or 435,000 sq. ft. mine slime pond that we lined with a four-layer geosynthetic system including 12 oz. non-woven geotextile, 80 mil smooth geomembrane, geonet and 80 mil single-sided textured geomembrane. We installed each layer as specified and successfully completed the project within the projected time frame amidst strict site requirements and less than ideal weather conditions.

Why Titan: We were awarded the project based on our experience with these projects and the mine’s satisfaction with our work on previous slime pond lining projects.