Frac Sand Transload Facility – 6 Dry Bulk Silos

Grand Prairie, Alberta

Who: Evergreen Transloading Terminal Ltd.

What: Frac Sand Transload Facility consisting of six 30’ diameter x 101’ high bolted dry bulk silos with 15’ long funnel flow center fill and center discharge hopper with interior suspended access/maintenance platform. These silos are constructed with large truck drive-thrus that allow quick and cost efficient loading of multiple trucks. This is extremely important in ensuring profitable fracking operations.

Why Titan: Because of our state-of-the art custom jacking process, we were able to complete all construction on the ground versus working at heights. This not only reduced risk by providing safer working conditions but also decreased project costs for our client by shortening production time, and eliminating the use of expensive cranes that are often unreliable in the winter. The project was completed on budget and on time despite cold seasonal conditions.