Frac Sand Transload Facility – 2 Dry Bulk Silos

Estevan, Saskatchewan

Who: Millennium Stimulation Services

What: Frac Sand Transload Facility consisting of two 35’ diameter x 112’ high bolted dry bulk silos with center discharge hoppers and interior suspended access/maintenance platform. Product flows across a 130’ conveyor and up a 185’ high bucket elevator. These silos are constructed with large truck drive-thrus that allow quick and cost efficient loading of multiple trucks. This is extremely important in ensuring profitable fracking operations.

Why Titan: We actively worked with the manufacturer and our client during the project development and design phase. Additionally, we provided general contracting services including procurement and management of all required trades and engineering professionals to construct the facility. With our scope of service, in-depth experience and range of expertise we provided our client with a complete turn-key package suiting their needs.